All tracks are operational

posted Dec 9, 2011, 9:35 PM by Randall Hammill
I completed adding feeders to all of the industrial tracks that are currently in place. Everything works (including the crossing I built), and will be tested more thoroughly.
 
Joseph is coming by tomorrow to run a test session. I have the cars left overnight staged, and in addition to having him run the local switching job I'll bring in a passenger train or two and NY-4 to drop off additional cars.
 
I will try to get some paperwork assembled for a test run tomorrow as well. So far the consensus is that it looks good, although I think I'm going to go for a larger size than Tony Koester or Tony Thompson uses. Chris and Dick agreed with that direction, Pete was fine with the smaller ones.
 
We'll see how it goes!